Hachikō Line(Takasaki to Komagawa)KIHA110 - 200 series

DLC for JR EAST Train Simulator

Details

Current prices

Steam
Digital
$26.99

Price history

All time low
$26.99    

The Hachikō Line is a 92-km long single-track line connecting Hachiōji Station in Hachiōji City, Tōkyō to Kuragano Station in Takasaki City, Gumma Prefecture. From Kuragano Station, the train connects to the Takasaki Line and runs to Takasaki Station. Hachioji Station to Komagawa Station is an electrified section, and from Komagawa Station to Kita-Fujioka Station is a non-electrified section, the only non-electrified section in Saitama Prefecture and one of the few in Gunma Prefecture. In this DLC, you can enjoy the non-electrified section between Takasaki Station and Komagawa Station. There are no overhead wires blocking the view, and the scenery along the line seen from the driver's seat is dynamic. The flat section from Takasaki Station to Yorii Station runs through urban areas and fields, while the mountainous section from Yorii Station to Komagawa Station is impressive, with several 20‰ grades and a view of mountain villages.

We hope you will enjoy the Hachikō Line with its full of local train atmosphere, where you can drive through mountainous sections with fields and 20‰ gradients and flat urban areas with this DLC.

Highlights

  • Branch with Takasaki Line / Kuragano~Kita-Fujioka

  • Beginning of non-electrified section/ Kuragano~Kita-Fujioka

  • Gumma Prefecture to Saitama Prefecture/Gumma-Fujioka~Tanshō

  • Running through a plain with vast fields of rice/ Tanshō~Kodama

  • Running parallel to Chichibu Railway /Yōdo~Yorii

  • Transfer station with Tōbu Tōjō Line and Chichibu Railway / Yorii

  • Entering the mountainous area from the flat section / Yorii~Orihara

  • Between stations with few flat sections /Orihara~Takezawa

  • Intersects and runs parallel with Tōbu Tōjō Line / Takezawa~Ogawamachi

  • Transfer station with Tōbu Tōjō Line / Ogawamachi

  • Longest distance between stations on the Hachikō Line / Ogawamachi~Myōkaku

  • The 100 Selected Stations of Kantō/ Myōkaku

  • Transfer station with Tōbu Ogose Line /Ogose

  • Running parallel to the Tōbu Ogose Line /Ogose~Moro

  • Abandoned railway line of the former Taiheiyō Cement Saitama Plant /Moro~Komagawa

Route Information

  • Section: Hachikō Line Inbound Takasaki⇒Komagawa

  • Total length: 65.3km

  • Number of Stations: 16

  • Security equipment: ATS-P

Train schedules that can be operated

  • Train Number:224D

  • Type/Destination: Local train to Komagawa(one-man operation)

  • Section where you can drive: Takasaki(06:35)→Komagawa(08:05)

  • Type of train: Series Kiha110-200 2 cars

  • Responsible for real voice train announcements: Takasaki unification center

  • Train Number:230D

  • Type/Destination: Local train to Komagawa(one-man operation)

  • Section where you can drive: Takasaki(11:56)→Komagawa(13:25)

  • Type of train: Series Kiha110-200 1 cars

  • Responsible for real voice train announcements: Takasaki unification center

  • Train Number:2268D

  • Type/Destination: Local train to Komagawa(one-man operation)

  • Section where you can drive: Ogawamachi(15:56)→Komagawa(16:23)

  • Type of train: Series Kiha110-200 2 cars

  • Responsible for real voice train announcements: Takasaki unification center

  • Train Number:2282D

  • Type/Destination: Local train to Kodama(one-man operation)

  • Section where you can drive: Takasaki(07:08)→Kodama(07:32)

  • Type of train: Series Kiha110-200 2 cars

  • Responsible for real voice train announcements: Takasaki unification center

※The system is equipped with automatic announcement and calling out when the train is operated as a one-man train. Door open/close operation is automatic.


Video Player is loading.
Current Time 0:00
Duration -:-
Loaded: 0%
Stream Type LIVE
Remaining Time -:-
 
1x
    • Chapters
    • descriptions off, selected
    • captions off, selected